<?xml version="1.0" encoding="utf-8"?>
<!-- generator="FeedCreator 1.7.2" -->
<rss version="2.0">
    <channel>
        <title>Lowyat.NET: Latest topics by jcsj1990</title>
        <description></description>
        <link>http://forum.lowyat.net/</link>
        <lastBuildDate>Fri, 12 Jun 2026 11:26:28 +0800</lastBuildDate>
        <generator>FeedCreator 1.7.2</generator>
        <item>
            <title>Electrical Works Cost</title>
            <link>http://forum.lowyat.net/topic/4647737</link>
            <description>Hi guys&lt;br /&gt;&lt;br /&gt;I&amp;#39;ve been quoted a rate for installation of new power point (cabling and labour). However, contractor say that same rate applies EVEN for 2 power point side by side and sharing same cable. Is this normal? Don&amp;#39;t sound logical to me.&lt;br /&gt;&lt;br /&gt;Hope others can help give feedback. Kthxbai.</description>
            <author>jcsj1990</author>
            <category>Home Renovations and Interior Design</category>
            <pubDate>Thu, 30 Aug 2018 11:14:10 +0800</pubDate>
        </item>
    </channel>
</rss>
