<?xml version="1.0" encoding="utf-8"?>
<!-- generator="FeedCreator 1.7.2" -->
<rss version="2.0">
    <channel>
        <title>Lowyat.NET: Latest topics by lsl25</title>
        <description></description>
        <link>http://forum.lowyat.net/</link>
        <lastBuildDate>Mon, 08 Jun 2026 19:25:11 +0800</lastBuildDate>
        <generator>FeedCreator 1.7.2</generator>
        <item>
            <title>Post Laser and Needling Treatment at Dr. Ko</title>
            <link>http://forum.lowyat.net/topic/4987500</link>
            <description>Hi, not sure if anyone can advise me or if they went through the same treatment before.&lt;br /&gt;&lt;br /&gt;I just had skin laser and needling done yesterday at Dr. Ko to treat my enlarged pores. After the treatment, they (or rather the lady at the counter) gave me their Dermacare Intense Repair Serum and also Isotretinoin (to control oil production). They asked me to apply only the serum after cleansing my face (no toner no moisturiser) for one week and thereafter with toner and moisturiser. Because the serum comes in a capsule form so they advised me to just use half of it each time (ie: half capsule in the morning and other half at night since it is quite oily). I applied it last night and this morning but my skin still feels super dry (especially on my cheeks and corners of my nose) but since they advised to only put the serum on with no toner and moisturiser, i&amp;#39;m just thinking if i should just go against what they say and just slap on some moisturiser on because i&amp;#39;m afraid that my skin will just turn into a dry sahara desert and make the healing process even worse if i don&amp;#39;t moisturise it.&lt;br /&gt;&lt;br /&gt;Has anyone gone to Dr. Ko and also got the same advise? How was it for you guys? Or did they advised you differently?</description>
            <author>lsl25</author>
            <category>Girl&amp;#39;s Club</category>
            <pubDate>Sun, 28 Jun 2020 16:14:04 +0800</pubDate>
        </item>
        <item>
            <title>Renovation Cost</title>
            <link>http://forum.lowyat.net/topic/4742887</link>
            <description>Hi guys,&lt;br /&gt;&lt;br /&gt;I just recently bought a 22 x 75 double storey terrace and am planning to renovate it.&lt;br /&gt;&lt;br /&gt;I would like to have some idea of how much would the rough total renovation cost be for the following:-&lt;br /&gt;&lt;br /&gt;&lt;b&gt;&lt;u&gt;Front part of the house - ground floor&lt;/u&gt;&lt;/b&gt;&lt;br /&gt;(i) Demolishing the garden and turning it into a concrete driveway that is 22x23 (instead of 10x23)&lt;br /&gt;(ii) Extending gate to 18 feet wide (currently is about 10 feet wide)&lt;br /&gt;(iii) Installing folding auto gate&lt;br /&gt;(iv) Driveway sidewalls to convert to brick wall as they are currently wire fencing&lt;br /&gt;(v) Removing the terrace portion, extending the Lounge area by 4 feet and installing sliding door with grilling&lt;br /&gt;(vi) Moving main door from Lounge to Dining and changing to safety door&lt;br /&gt;&lt;br /&gt;&lt;b&gt;&lt;u&gt;Back part of the house - ground floor&lt;/u&gt;&lt;/b&gt;&lt;br /&gt;(i) Extending the back portion of the house by 12 x 12, moving the bathroom to the back and combining wet kitchen with dry kitchen&lt;br /&gt;(ii) Installing safety back door&lt;br /&gt;&lt;br /&gt;&lt;b&gt;&lt;u&gt;1st floor&lt;/u&gt;&lt;/b&gt;&lt;br /&gt;(i) Removing the balcony and extending the Bedroom 1&lt;br /&gt;(ii) Demolishing Bath 1 and moving to the front (10 x 8), creating an extra room for walk-in closet (10 x 8)&lt;br /&gt;(iii) Recessed wall shelf in shower area for Bath 1&lt;br /&gt;(iv) Demolishing walls in Bedroom 2 to change it into Study&lt;br /&gt;(v) Extending the back portion of the house by 10 x 5, moving Bath 2 to the back and combining previous Bath 2 are and Study into Bedroom 2&lt;br /&gt;&lt;br /&gt;&lt;b&gt;&lt;u&gt;Others&lt;/u&gt;&lt;/b&gt;&lt;br /&gt;(i) Changing floor tilling downstairs; upstairs changing to vinyl&lt;br /&gt;(ii) Plaster ceiling for whole house - no L box&lt;br /&gt;(iii) Changing wiring and plumbing for whole house&lt;br /&gt;(iv) New roof to replace old roof&lt;br /&gt;(v) Painting for whole house (labour only)&lt;br /&gt;(vi) Installing piping for 6 aircons (labour only)&lt;br /&gt;&lt;br /&gt;Also, would like to know how much does it cost to:-&lt;br /&gt;(i) Build wood panel to hide walk in closet entrance &lt;br /&gt;(ii) Feature wall for outdoor using wood grilling&lt;br /&gt;&lt;br /&gt;&lt;img src='https://pictr.com/images/2019/02/23/0JPoNx.md.jpg' border='0' alt='user posted image' /&gt;&lt;br /&gt;&lt;img src='https://pictr.com/images/2019/02/23/0JPAdv.md.jpg' border='0' alt='user posted image' /&gt;&lt;br /&gt;&lt;br /&gt;Thanks in advance&amp;#33;</description>
            <author>lsl25</author>
            <category>Home Renovations and Interior Design</category>
            <pubDate>Sat, 23 Feb 2019 21:43:47 +0800</pubDate>
        </item>
        <item>
            <title>Items held by customs</title>
            <link>http://forum.lowyat.net/topic/3929368</link>
            <description>Hi guys,&lt;br /&gt;&lt;br /&gt;I am hoping someone could help me on this. I have ordered some items (2 pieces of clothes to be specific) from Singapore and according to the tracking site, it says that my items has been held by customs for 3-4 days now.&lt;br /&gt;&lt;br /&gt;When it means held by customs, does it mean that it is confirmed that i would have to collect my parcel from the customs? Or do they mean that it is still under checking and if everything is ok, it will be cleared for delivery?&lt;br /&gt;And also am i able to drop by the customs office to collect the parcel even without receiving any notice from them? Since my tracking site already mentioned that it is being held by customs.</description>
            <author>lsl25</author>
            <category>Serious Kopitiam</category>
            <pubDate>Sat, 23 Apr 2016 02:06:19 +0800</pubDate>
        </item>
    </channel>
</rss>
