<?xml version="1.0" encoding="utf-8"?>
<!-- generator="FeedCreator 1.7.2" -->
<rss version="2.0">
    <channel>
        <title>Lowyat.NET: Latest topics by xerofear</title>
        <description></description>
        <link>http://forum.lowyat.net/</link>
        <lastBuildDate>Wed, 01 Jul 2026 15:37:37 +0800</lastBuildDate>
        <generator>FeedCreator 1.7.2</generator>
        <item>
            <title>Renovation Journal</title>
            <link>http://forum.lowyat.net/topic/5107782</link>
            <description>Starting this thread to consolidate and share my unit renovation progress for all to see and comment. Any constructive criticism is welcomed. &lt;br /&gt;&lt;br /&gt;&lt;b&gt;Summary of Unit:&lt;/b&gt;&lt;br /&gt;N&amp;#39;dira Townhouse intermediate lower unit (Type A) with built-up of 2,207 sqft&lt;br /&gt;Obtained keys: Dec 2020&lt;br /&gt;Defect check completed: Jan 2021&lt;br /&gt;Reno start: Late Jan 2021&lt;br /&gt;&lt;br /&gt;&lt;b&gt;Defect Summary:&lt;/b&gt;&lt;br /&gt;Minor pipe leak at toilet bidet&lt;br /&gt;Misalignment of shower heads and taps&lt;br /&gt;Minor tile cracks&lt;br /&gt;Minor paint stains, chips &amp;amp; dents&lt;br /&gt;&lt;br /&gt;&lt;b&gt;Reno Scope of Works:&lt;/b&gt;&lt;br /&gt;Interior Design - self&lt;br /&gt;Kitchen &amp;amp; Carpentry Work - Kitchen Contractor&lt;br /&gt;Plumbing (Hot &amp;amp; Cold) - General Contractor&lt;br /&gt;Lighting &amp;amp; Electrical Wiring - Electrical Contractor&lt;br /&gt;Air Conditioning - AC Contractor&lt;br /&gt;Plaster Ceiling - General Contractor&lt;br /&gt;Flooring - General Contractor&lt;br /&gt;Painting - General Contractor&lt;br /&gt;Curtains - Curtain Contractor&lt;br /&gt;Grill/Mesh Doors - TBD&lt;br /&gt;&lt;br /&gt;&lt;b&gt;List of Items to be Purchased&lt;/b&gt;&lt;br /&gt;Living room furniture&lt;br /&gt;Dining table &amp;amp; chairs&lt;br /&gt;Fridge&lt;br /&gt;Washing Machine&lt;br /&gt;Master bedroom, bedroom 2 &amp;amp; study room furniture&lt;br /&gt;All lighting &amp;amp; fan fixtures&lt;br /&gt;Kitchen sink &amp;amp; tap&lt;br /&gt;All shower fixtures&lt;br /&gt;Hot water storage&lt;br /&gt;&lt;br /&gt;There would be no changes to unit structure so no permits are required other than renovation documentation and deposit submission to JMB. Hoping to keep total budget around RM 120K (fingers crossed)&lt;br /&gt;&lt;br /&gt;Attached is the perspective drawing for the unit for reference.</description>
            <author>xerofear</author>
            <category>Home Renovations and Interior Design</category>
            <pubDate>Wed, 24 Feb 2021 11:45:00 +0800</pubDate>
        </item>
        <item>
            <title>Delete</title>
            <link>http://forum.lowyat.net/topic/5107778</link>
            <description>Post in wrong section</description>
            <author>xerofear</author>
            <category>Property Talk</category>
            <pubDate>Wed, 24 Feb 2021 11:39:13 +0800</pubDate>
        </item>
        <item>
            <title>Engineering Career Development</title>
            <link>http://forum.lowyat.net/topic/4864855</link>
            <description>Dear sifus,&lt;br /&gt;&lt;br /&gt;Feeling a bit lost at the moment with regards to how to further develop my career.&lt;br /&gt;&lt;br /&gt;A brief background:&lt;br /&gt;&lt;br /&gt;I graduated with a B.Eng in Chemical Engineering and am currently working in a multi-role position as a project engineer while supporting the sales department with system technical design &amp;amp; costing within the mechanical(HVAC/R) industry.&lt;br /&gt;&lt;br /&gt;Among some of my tasks are:&lt;br /&gt;1. Project system design of BMS for M&amp;amp;E equipment&lt;br /&gt;2. Assist sales department with project costing including labour costing&lt;br /&gt;3. Develop controller programming &amp;amp; optimization&lt;br /&gt;4. Site commissioning of said system design&lt;br /&gt;&lt;br /&gt;A self assessment, I would say that I would have a solid grasp in understanding the basic control mechanisms of HVAC equipments, generating I/O lists and from there, create control strategies for them using available BMS equipment. However, very specific details such as chiller loading/unloading strategies are still something that I have to improve my knowledge on.&lt;br /&gt;&lt;br /&gt;I am looking for ways to develop my career more towards the HVAC industry with future plans on becoming a consultant. Another thing is that a pure sales role is something I am keenly opposed to.&lt;br /&gt;&lt;br /&gt;I know that as it stands, my working experience is all over the place hence any inputs on courses advice/future job undertakings is greatly appreciated.</description>
            <author>xerofear</author>
            <category>Jobs &amp;amp; Careers</category>
            <pubDate>Thu, 14 Nov 2019 16:45:08 +0800</pubDate>
        </item>
    </channel>
</rss>
