<?xml version="1.0" encoding="utf-8"?>
<!-- generator="FeedCreator 1.7.2" -->
<rss version="2.0">
    <channel>
        <title>Lowyat.NET: Latest topics by karichiken</title>
        <description></description>
        <link>http://forum.lowyat.net/</link>
        <lastBuildDate>Mon, 20 Jul 2026 00:13:46 +0800</lastBuildDate>
        <generator>FeedCreator 1.7.2</generator>
        <item>
            <title>What about Signature Kitchen?</title>
            <link>http://forum.lowyat.net/topic/2437273</link>
            <description>What about Signature Kitchen?&lt;br /&gt;&lt;br /&gt;I bought a new house and recently I was doing renovation which included installation of kitchen cabinets. I took my time to search around and finally to go with Signature Kitchen. Though they are a lot more expensive than some of the other local makes, I went with them since I guess they are one of the more popular around.&lt;br /&gt;&lt;br /&gt;Since making the booking a few months ago, the kitchen is now almost complete and looking good.&lt;br /&gt;&lt;br /&gt;Since today, I want to share my experience with Signature Kitchen when it comes to their installation.&lt;br /&gt;&lt;br /&gt;1st visit – The contractors came to install the cabinets, drawers and accessories. They came about 10:00AM and finished about 5:00PM. Later I found out that a drawer handle, was missing, a swivel basket is missing and a glass panel in the cabinet is missing.&lt;br /&gt;Effort from me: 1 day leave and drove 100km to my new house and back. All in all, it was a very productive day.&lt;br /&gt;&lt;br /&gt;2nd visit – The next contractor came to measure the Counter Top.&lt;br /&gt;Effort from me: Took time off from work and drove 100Km. Waited for the contractor for 1 hour. The measuring took only about half hour.&lt;br /&gt;&lt;br /&gt;3rd visit – Another contractor called me to say that they are coming to collect the garbish from the 1st contractor.&lt;br /&gt;Effort from me: Took time off from work. Drove 100Km. Garbage collection took about 10 minutes.&lt;br /&gt;&lt;br /&gt;4th visit – Counter Top contractor came to install the granite.&lt;br /&gt;Effort from me: Tool 1 day leave. Drove 100Km. Installation took about 3 hours.&lt;br /&gt;&lt;br /&gt;5th visit – Next contractor came to measure the Glass Panel for the wall. That took about half and hour but I had to wait 1 hour for him because he was late.&lt;br /&gt;Effort from me: This happened on a Saturday so I need not take leave. Drove 100Km.&lt;br /&gt;&lt;br /&gt;At this point I started to beg Signature Kitchen to please organize the contractors in as little visits as possible.&lt;br /&gt;&lt;br /&gt;6th visit (today) – Glass Panel contractor was suppose to come at 10AM to install the glass panel. When I arrive and called them, they said the appointment is at 1PM. I call Signature Kitchen and they say they cannot do anything. A plumber was also supposed to come to install the sink and piping but did not show up.&lt;br /&gt;Effort from me: Since it was a Saturday, no need to take leave. I drove 200Km and 5 hours spent waiting. The installation only took 1 hour.&lt;br /&gt;&lt;br /&gt;&lt;br /&gt;So far it has cost me over priced amount of money + 700 kilometers + 6 visits. They still need to install the missing parts from the 1st contractor and also the plumbing which did not show up today.&lt;br /&gt;&lt;br /&gt;I do not know how many more visits and how many more kilometers it will cost me before the damn installation is completed.</description>
            <author>karichiken</author>
            <category>Home Renovations and Interior Design</category>
            <pubDate>Sat, 21 Jul 2012 18:42:36 +0800</pubDate>
        </item>
    </channel>
</rss>
