<?xml version="1.0" encoding="utf-8"?>
<!-- generator="FeedCreator 1.7.2" -->
<rss version="2.0">
    <channel>
        <title>Lowyat.NET: Latest topics by mudahman</title>
        <description></description>
        <link>http://forum.lowyat.net/</link>
        <lastBuildDate>Sat, 20 Jun 2026 12:12:47 +0800</lastBuildDate>
        <generator>FeedCreator 1.7.2</generator>
        <item>
            <title>3 Phase wiring - joints</title>
            <link>http://forum.lowyat.net/topic/3561523</link>
            <description>Hi,&lt;br /&gt;&lt;br /&gt;My house undergoing extensive renovations. This includes all new air cond points and 3 phase concealed wioring, alarm and cctv wiring.&lt;br /&gt;Recently had  a break in and thieves stole all the wires and copper tubing...cutting them all off at the exposed Ends - i.e. at the DB Box area and at the plug points etc where the wires come out.&lt;br /&gt;&lt;br /&gt;My Wiring con now wants to ADD new wires by JOINING/SPLICING the ends at the DB area and at the Outlets areas...&lt;br /&gt;My Concern is that as of now..EACH and EVERY WIRE has been cut off at 2 ends..and there will be a JOINT/SPLICE at BOTH Ends. Each Air con point will also have to eb hacked and redone with new copper tubing added/spliced and the wires joined/spliced.&lt;br /&gt;&lt;br /&gt;Since I have paid top price for this Electrical work..is it fair to me to be given JOINTED WIRES for 100% of the wires..not just one joint but 2 on each wire.&lt;br /&gt;&lt;br /&gt;&lt;br /&gt;1. I Insist on a Total REHACK and redo with brand new un-jointed wires.&lt;br /&gt;2. I accept the jointed wires..(what discount should i ask for ).&lt;br /&gt;&lt;br /&gt;The Break In is 100% Con&amp;#39;s responsibility because his workers SOLD off all the old grills gates etc which left the construction Site 100% Open and Exposed to such incident. &lt;br /&gt;&lt;br /&gt;Electrical cons please advise..&lt;br /&gt;&lt;br /&gt;Thanks.</description>
            <author>mudahman</author>
            <category>Home Renovations and Interior Design</category>
            <pubDate>Sat, 25 Apr 2015 13:14:05 +0800</pubDate>
        </item>
        <item>
            <title>structure works</title>
            <link>http://forum.lowyat.net/topic/3454637</link>
            <description>Hi Guys,&lt;br /&gt;&lt;br /&gt;My contractor quoted me a &amp;quot;Structure works&amp;quot; for a 2.5 storey extension at Rm130 + 30 for each floor. This included footings/foundations/beams/columns and slabs ONLY.&lt;br /&gt;&lt;br /&gt;Then he quoted separately for Brickwork/door frames/doors etc . at Rm 25 PSF.&lt;br /&gt;&lt;br /&gt;All previous contractors quotes for &amp;quot;structure&amp;quot; included such things as brick walls,frames, doors cement render floor etc.&lt;br /&gt;&lt;br /&gt;I have got another quote for all in at Rm100 psf.  inclusive of all brickwalls etc.&lt;br /&gt;&lt;br /&gt;I want to know if the first quote is correct way. Should all brickwork/doors/frames etc be included in a Structure &amp;quot; quote and not separately.  Is the first con trying to pull a fast one on me ?&lt;br /&gt;&lt;br /&gt;Earlier also my extension five years ago was Rm88 all in.&lt;br /&gt;&lt;br /&gt;Extension at 15 ft by 22 ft .  &lt;br /&gt;&lt;br /&gt;Thanks</description>
            <author>mudahman</author>
            <category>Home Renovations and Interior Design</category>
            <pubDate>Mon, 29 Dec 2014 18:28:13 +0800</pubDate>
        </item>
    </channel>
</rss>
