<?xml version="1.0" encoding="utf-8"?>
<!-- generator="FeedCreator 1.7.2" -->
<rss version="2.0">
    <channel>
        <title>Lowyat.NET: Latest topics by O.CModderz</title>
        <description></description>
        <link>http://forum.lowyat.net/</link>
        <lastBuildDate>Sun, 21 Jun 2026 12:09:38 +0800</lastBuildDate>
        <generator>FeedCreator 1.7.2</generator>
        <item>
            <title>Proton Wira 1.5A Jerking With Air Conditioner</title>
            <link>http://forum.lowyat.net/topic/4324508</link>
            <description>Hello all, car noob here  &lt;!--emo&amp;:sweat:--&gt;&lt;img src='http://static.lowyat.net/style_emoticons/default/sweat.gif' border='0' style='vertical-align:middle' alt='sweat.gif' /&gt;&lt;!--endemo--&gt;  &lt;!--emo&amp;:sweat:--&gt;&lt;img src='http://static.lowyat.net/style_emoticons/default/sweat.gif' border='0' style='vertical-align:middle' alt='sweat.gif' /&gt;&lt;!--endemo--&gt; &lt;br /&gt;&lt;br /&gt;I have a 2002 Wira 1.5A that has been overhauled just over a year ago with new throttle body since previous one already kong. So recently my car started jerking all of a sudden when I was driving when I have my air conditioner on. Here&amp;#39;s the full narrative:&lt;br /&gt;(Mostly happens during a very hot weather with the air conditioner on)&lt;br /&gt;1. Starts up car as usual and warms up for around 5 minutes.&lt;br /&gt;2. Drives around for about 1km before I started breaking and suddenly the car started jerking and the engine completely shuts off.&lt;br /&gt;3. Able to restart the engine with ease and continues driving.&lt;br /&gt;4. Made a low speed turn and when I try to accelerate, the car kept jerking even with the pedal down until I eased off the throttle, then it can accelerate, but slowly. When I was at the traffic lights, the engine felt like it was going to stall with my brake down and the gear in drive, so I placed it to neutral and everything was fine again.&lt;br /&gt;&lt;br /&gt;But if I didn&amp;#39;t turn on the aircond, none of the problems occur.&lt;br /&gt;&lt;br /&gt;Not really sure what&amp;#39;s the issue here  &lt;!--emo&amp;:confused:--&gt;&lt;img src='http://static.lowyat.net/style_emoticons/default/confused.gif' border='0' style='vertical-align:middle' alt='confused.gif' /&gt;&lt;!--endemo--&gt;  &lt;!--emo&amp;:confused:--&gt;&lt;img src='http://static.lowyat.net/style_emoticons/default/confused.gif' border='0' style='vertical-align:middle' alt='confused.gif' /&gt;&lt;!--endemo--&gt;   Can anyone help out?? &lt;br /&gt;Thanks in advance  &lt;!--emo&amp;:)--&gt;&lt;img src='http://static.lowyat.net/style_emoticons/default/smile.gif' border='0' style='vertical-align:middle' alt='smile.gif' /&gt;&lt;!--endemo--&gt;</description>
            <author>O.CModderz</author>
            <category>The Fast &amp;amp; The Furious</category>
            <pubDate>Tue, 13 Jun 2017 12:28:27 +0800</pubDate>
        </item>
        <item>
            <title>[WTS] Custom Budget Gaming System Builder</title>
            <link>http://forum.lowyat.net/topic/3155577</link>
            <description>&lt;b&gt;&lt;span style='font-size:16pt;line-height:100%'&gt;                                                           Carbon Dynamics&lt;br /&gt;                                                                         Performance Computing - Unprecedented Quality &lt;/span&gt;&lt;/b&gt;&lt;br /&gt;&lt;br /&gt;&lt;b&gt;&lt;span style='font-family:Arial'&gt;&lt;span style='font-size:14pt;line-height:100%'&gt;&lt;span style='color:red'&gt; About Us &lt;/span&gt;&lt;/span&gt;&lt;/span&gt;&lt;/b&gt;&lt;br /&gt;&lt;!--SPOILER BEGIN--&gt;&lt;div class=&quot;spoilertop&quot; onClick=&quot;openClose('6d956d4c2ab9c002f2e455ccf2776867')&quot; style=&quot;font-weight: bold&quot;&gt;&lt;u&gt;&amp;raquo; Click to show Spoiler - click again to hide... &amp;laquo;&lt;/u&gt;&lt;/div&gt;&lt;div class=&quot;spoilermain&quot; id=&quot;6d956d4c2ab9c002f2e455ccf2776867&quot; style=&quot;display:none&quot;&gt;&lt;!--SPOILER END--&gt;I’m a passionate student who loves building computers which provides boutique system building services for any other enthusiast like me Our mission is to build extreme systems at an affordable rate focusing on performance computing and unprecedented quality in every build we deliver. Ranging from basic systems to hardcore rigs, you name it, we got it. Carbon Dynamics provides the best computing experience one could ever have.  It means a high tier and continuous support system throughout the warranty of your system.  It is true that any company or person can build a good system to suit one’s needs but good isn’t just enough. We want it to be perfect. Many might claim that they could offer a custom system but it doesn’t make sure that you enjoy the whole experience where customization and services are of top priority. We believe clients should have systems with rock solid performance and reliability. &lt;!--SPOILER DIV--&gt;&lt;/div&gt;&lt;!--SPOILER DIV--&gt;&lt;br /&gt;&lt;br /&gt;&lt;br /&gt;&lt;b&gt;&lt;span style='font-family:Arial'&gt;&lt;span style='font-size:14pt;line-height:100%'&gt;&lt;span style='color:red'&gt; Products &amp;amp; Services &lt;/span&gt;&lt;/span&gt;&lt;/span&gt;&lt;/b&gt;&lt;br /&gt;&lt;br /&gt;&lt;!--SPOILER BEGIN--&gt;&lt;div class=&quot;spoilertop&quot; onClick=&quot;openClose('7dcfbde50edcb30e3b448fd894868201')&quot; style=&quot;font-weight: bold&quot;&gt;&lt;u&gt;&amp;raquo; Click to show Spoiler - click again to hide... &amp;laquo;&lt;/u&gt;&lt;/div&gt;&lt;div class=&quot;spoilermain&quot; id=&quot;7dcfbde50edcb30e3b448fd894868201&quot; style=&quot;display:none&quot;&gt;&lt;!--SPOILER END--&gt;What does Carbon Dynamics have to offer?&lt;br /&gt;-Extreme Personalization (we will provide continuous support throughout the process of building a boutique system with a wide selection of high-end components)&lt;br /&gt;&lt;br /&gt;-Hand built by experienced and Certified Carbon Dynamics System Builders ( anyone could build a pc, but it doesn’t mean that the system is perfect)&lt;br /&gt;&lt;br /&gt;-Hand tested every component to ensure pure performance (every Carbon Dynamics system undergoes at least 72 hours of testing and benchmarks to ensure stability and reliability)&lt;br /&gt;&lt;br /&gt;-Quality and Performance Components (every component in our systems are hand-picked and tested to ensure long lifespan where only the best in quality and performance above our passing standard enters a particular system.&lt;br /&gt;&lt;br /&gt;-Sleek and Elegant system (guess that explains it all)&lt;br /&gt;&lt;br /&gt;-Stylish interior with thermal optimization (custom cabling just makes everything better)&lt;br /&gt;&lt;!--SPOILER DIV--&gt;&lt;/div&gt;&lt;!--SPOILER DIV--&gt;&lt;br /&gt;&lt;br /&gt;&lt;b&gt;&lt;span style='font-family:Arial'&gt;&lt;span style='font-size:14pt;line-height:100%'&gt;&lt;span style='color:red'&gt; System Building Method &lt;/span&gt;&lt;/span&gt;&lt;/span&gt;&lt;/b&gt;&lt;br /&gt;&lt;br /&gt;&lt;!--SPOILER BEGIN--&gt;&lt;div class=&quot;spoilertop&quot; onClick=&quot;openClose('15c921d5d1d4324d4e0b32da39014b47')&quot; style=&quot;font-weight: bold&quot;&gt;&lt;u&gt;&amp;raquo; Click to show Spoiler - click again to hide... &amp;laquo;&lt;/u&gt;&lt;/div&gt;&lt;div class=&quot;spoilermain&quot; id=&quot;15c921d5d1d4324d4e0b32da39014b47&quot; style=&quot;display:none&quot;&gt;&lt;!--SPOILER END--&gt;•	Each client will start off with a basic kit for different systems where all the parts which meet our minimum requirements have been selected.&lt;br /&gt;•	They will have the option to customize the kits based on our wide selection of hardware for upgrades. &lt;br /&gt;•	Once the kit whether stock or upgraded has been decided, a full payment shall be required in order to continue the process. Do note that hardware prices tend to fluctuate a lot due to exchange rate, etc. so we encourage you to inquire about the pricing of the system before billing in the payment.&lt;br /&gt;•	Once the payment has been made, we will start assembling your system and will be in touch to provide the latest status of the system.  Installation of system comes with the system by default and the necessary software will be installed without the presence of bloatware.   &lt;br /&gt;•	Continuous 72 hour stress test and benchmarking will proceed with total care to ensure constant stability.&lt;br /&gt;•	Once the stress testing has been done, the system will be packaged and sent to the end-user though it may take up to 20 days to complete the whole stress test and building process before proceeding with shipping.&lt;!--SPOILER DIV--&gt;&lt;/div&gt;&lt;!--SPOILER DIV--&gt;&lt;br /&gt;&lt;br /&gt;&lt;b&gt;&lt;span style='font-family:Arial'&gt;&lt;span style='font-size:14pt;line-height:100%'&gt;&lt;span style='color:red'&gt; Purchasing Method, Payment Terms &amp;amp; Shipping &lt;/span&gt;&lt;/span&gt;&lt;/span&gt;&lt;/b&gt;&lt;br /&gt;&lt;!--SPOILER BEGIN--&gt;&lt;div class=&quot;spoilertop&quot; onClick=&quot;openClose('c174e05e3d2a97d70db22821bb0b6aa5')&quot; style=&quot;font-weight: bold&quot;&gt;&lt;u&gt;&amp;raquo; Click to show Spoiler - click again to hide... &amp;laquo;&lt;/u&gt;&lt;/div&gt;&lt;div class=&quot;spoilermain&quot; id=&quot;c174e05e3d2a97d70db22821bb0b6aa5&quot; style=&quot;display:none&quot;&gt;&lt;!--SPOILER END--&gt;•	Bank In / Wire Transfer to : Maybank available. Credit Card Purchase is not available, for now…&lt;br /&gt;•	Shipping &lt;br /&gt;&lt;br /&gt;#&lt;a href='http://track.kangaroo.com.my/' target='_blank'&gt;Kangaroo Tracking&lt;/a&gt;&lt;br /&gt;&lt;br /&gt;•	We currently don’t have a stationary COD location available so all of our system will be shipped out to the customers via Kangaroo Courier. Delivery is within the next 1-2 working day/s however it will take longer if the shipping address is well beyond 40km from the main branch for certain locations. For more information, please click the link included.  Some branches will require at least 5 different parcels to your location in order to proceed with the shipping process. Do contact the branch which collected your system for more information on the current status about it.&lt;br /&gt;&lt;a href='http://www.kangaroo.com.my/branches.html' target='_blank'&gt;http://www.kangaroo.com.my/branches.html&lt;/a&gt;&lt;br /&gt;•	 Shipment is covered by the default insured value of each courier. Any additional insurance required is the client’s responsibility. Any loss or damage occurred during shipment is at the client’s own risk. We are Not Responsible for any Loss Or Damage That Occurred During Shipment but we will make sure that every single system is packaged as neatly as possible.&lt;br /&gt;•	Full payment is required before building the system and the shipping cost will be provided once the system has been completed.&lt;br /&gt;&lt;br /&gt;&lt;!--SPOILER DIV--&gt;&lt;/div&gt;&lt;!--SPOILER DIV--&gt;&lt;br /&gt;&lt;br /&gt;&lt;b&gt;&lt;span style='font-family:Arial'&gt;&lt;span style='font-size:14pt;line-height:100%'&gt;&lt;span style='color:red'&gt; Contact Method &lt;/span&gt;&lt;/span&gt;&lt;/span&gt;&lt;/b&gt;&lt;br /&gt;&lt;!--SPOILER BEGIN--&gt;&lt;div class=&quot;spoilertop&quot; onClick=&quot;openClose('d7e72851f7164b4a667e1d062f7c2ed2')&quot; style=&quot;font-weight: bold&quot;&gt;&lt;u&gt;&amp;raquo; Click to show Spoiler - click again to hide... &amp;laquo;&lt;/u&gt;&lt;/div&gt;&lt;div class=&quot;spoilermain&quot; id=&quot;d7e72851f7164b4a667e1d062f7c2ed2&quot; style=&quot;display:none&quot;&gt;&lt;!--SPOILER END--&gt;•	Feel free to drop us a private message (PM) or via facebook at www.facebook.com/CarbonDynamics&lt;!--SPOILER DIV--&gt;&lt;/div&gt;&lt;!--SPOILER DIV--&gt;&lt;br /&gt;&lt;br /&gt;&lt;b&gt;&lt;span style='font-family:Arial'&gt;&lt;span style='font-size:14pt;line-height:100%'&gt;&lt;span style='color:red'&gt; Terms &amp;amp; Conditions &lt;/span&gt;&lt;/span&gt;&lt;/span&gt;&lt;/b&gt; EXTREMELY IMPORTANT, READ BEFORE PURCHASING&lt;br /&gt;&lt;!--SPOILER BEGIN--&gt;&lt;div class=&quot;spoilertop&quot; onClick=&quot;openClose('b715b6440f3a64849663f7133b9feda9')&quot; style=&quot;font-weight: bold&quot;&gt;&lt;u&gt;&amp;raquo; Click to show Spoiler - click again to hide... &amp;laquo;&lt;/u&gt;&lt;/div&gt;&lt;div class=&quot;spoilermain&quot; id=&quot;b715b6440f3a64849663f7133b9feda9&quot; style=&quot;display:none&quot;&gt;&lt;!--SPOILER END--&gt;&lt;br /&gt;A. Disclaimer&lt;br /&gt;•	Customer agrees that Carbon Dynamics is not liable for mismatched product pictures or mistakes in product information. Carbon Dynamics reserves the right to change products and specifications and those listed on the Site may not be current. Customer agrees to verify the specifications of each product with the order. Carbon Dynamics is only responsible for products named on the invoice.&lt;br /&gt;•	Our sales representatives are not authorized to make any representations or promises related to any product or services that exceed these terms and conditions and the warranty. Any additional provisions to your purchase must be made in writing signed by an officer of Carbon Dynamics&lt;br /&gt;•	Customer agrees that each item in a multi-item purchase from Carbon Dynamics shall be treated independently unless stated otherwise in the memo section of their order. That is, defect, replacement, and cancellation of one item does not constitute the voiding of the entire purchase. Each item shall be considered independently for warranty or refund purposes unless the customer has stated otherwise in the invoice memo.&lt;br /&gt;•	Customer agrees that shipping costs and expenses will not be refunded once we ship.&lt;br /&gt;•	It is the Customer&amp;#39;s responsibility to look over their email confirmation and make sure all shipping, billing and item purchased are correct. If you do not get an email confirmation, call us to see if the order went through. Do not submit multiple orders or you will end up paying full restocking and shipping fees.&lt;br /&gt;•	Order cancellation will be accepted over the web (only before the order is processed). It cannot be done over email. You can confirm order cancellation by checking the order status via PM. Once the system has entered stage1, Order Cancellation Shall No Longer Be Accepted so please be in close contact with us as frequent as possible.&lt;br /&gt;•	Material fee for boxes, transportation, etc. are included in the shipping fee. Customer shall not be liable for additional shipping charges for purchases Carbon Dynamics chooses to ship in multiple packages unless they request and agree to shipping upgrades and upgrade fees. Carbon Dynamics does include shipping insurance with every shipment.&lt;br /&gt;•	&amp;quot;Customer&amp;quot; agrees that Carbon Dynamics will not liable for shipper&amp;#39;s shipping delays.&lt;br /&gt;&lt;br /&gt;B. Making Purchases&lt;br /&gt;If you wish to purchase products offered on the thread, you will be asked to supply certain information, including but not limited to other payment information. You agree that all information you provide to Carbon Dynamics will be accurate complete and current. You agree to pay all charges incurred by authorized users of your account or other payment mechanism at the prices in effect when such charges are incurred. You will also be responsible for paying any applicable taxes, and shipping and handling charges relating to your purchases.&lt;br /&gt;&lt;br /&gt;C. Where We Ship&lt;br /&gt;We ship to any physical address that the shipper/courier can ship to domestically only (Peninsula Malaysia). Due to the number of wrong addresses from customers, we now charge the face value that the shipper/courier charges us to reroute your package if you did not enter the address correctly. This charge is anywhere from RM25-RM90 and you agree if your address is wrong, Carbon Dynamics is authorized to charge you for these fees.&lt;br /&gt;&lt;br /&gt;D. When We Ship&lt;br /&gt;Orders received are usually processed the same day for product build. Products are shipped only after build which can take up to&lt;b&gt; 20 days on a standard basis ( Only Free On Weekends )&lt;/b&gt;. Your order may be delayed if your ship to address does not match what your credit card issuer has on their file. If you choose next day air service, it does not necessarily mean you will get it the next day from the order date, it means that you will get it the next day from the date we ship the order. Carbon Dynamics reserves the right at any time after receipt of your order to delay your order for any reason.&lt;br /&gt;&lt;br /&gt;E. Shipping Delays&lt;br /&gt;Once an order is shipped, it is up to the shipper courier to deliver the products; we will not be able to stop the shipment once it is shipped. Another delay is if there is no one to sign for the package, every package we ship usually requires a signature, if a package is returned to us because no one was available to sign for it or the address was input incorrectly at the time you enter the order, you will be charged again to ship it out a second time.&lt;br /&gt;&lt;br /&gt;F. Pricing &amp;amp; Typographical Errors&lt;br /&gt;Due to the fast pace of the computer industry, all prices are subject to change without notice. We make every effort to list the most accurate, up to the minute information. Despite our efforts, some items on our website may be miss-priced. If a product is listed at an incorrect price due to a typographical, photographical, or technical error or error in pricing from our vendors, Carbon Dynamics reserves the right to refuse or cancel any orders placed for a product listed at the incorrect price. Due to the volatility in pricing for computer products, we do not match competitor&amp;#39;s pricing and we will not offer price protection beyond the 24hours of purchase. Example: If Intel drops the price of a processor 5 days after your purchase, that is beyond our control and our cost for that same processor when we shipped is also much higher than our current selling price. We will not be able to refund the difference since we had to purchase the processor at a much higher cost to send it to you when you placed your order.&lt;br /&gt;&lt;br /&gt;G. Order Acceptance Policy&lt;br /&gt;Your receipt of an electronic or phone order confirmation does not signify our acceptance of your order. Digital Storm reserves the right at any time after receipt of your order to accept or decline your order for any reason.&lt;br /&gt;&lt;br /&gt;H. DISCLAIMER AND LIMITATION OF LIABILITY AS TO PRODUCTS SOLD&lt;br /&gt;&lt;br /&gt;YOU AGREE THAT THE SOLE AND EXCLUSIVE MAXIMUM LIABILITY TO CARBON DYNAMICS. ARISING FROM ANY PRODUCT SOLD BY CARBON DYNAMICS SHALL BE THE PRICE OF THE PRODUCT ORDERED. IN NO EVENT SHALL CARBON DYNAMICS AND REPRESENTATIVES BE LIABLE FOR SPECIAL, INDIRECT, CONSEQUENTIAL, OR PUNITIVE DAMAGES RELATED TO PRODUCT SOLD.&lt;br /&gt;1. DISCLAIMER AND LIMITATION OF LIABILITY AS TO THE CARBON DYNAMICS FACEBOOK PAGE. THE CARBON DYNAMICS FACEBOOK PAGE AND THE MATERIALS THEREIN ARE PROVIDED “AS IS”. CARBON DYNAMICS. MAKES NO REPRESENTATIONS OR WARRANTIES, EITHER EXPRESS OR IMPLIED, OF ANY KIND WITH RESPECT TO THE CARBON DYNAMICS FACEBOOK PAGE, THEIR OPERATION, CONTENTS, INFORMATION, OR MATERIALS ON THE SITE. CARBON DYNAMICS EXPRESSLY DISCLAIMS ALL WARRANTIES, EXPRESS OR IMPLIED, OF ANY KIND WITH RESPECT TO THE SITE OR THEIR USE, INCLUDING BUT NOT LIMITED TO ANY IMPLIED WARRANTY OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE. YOU AGREE THAT CARBON DYNAMICS, ITS DIRECTORS, OFFICERS, EMPLOYEES OR OTHER REPRESENTATIVES SHALL NOT BE LIABLE FOR DAMAGES ARISING FROM THE OPERATION OR CONTENT. YOU AGREE THAT THIS LIMITATION OF LIABILITY IS COMPREHENSIVE AND APPLIES TO ALL DAMAGES OF ANY KIND, INCLUDING WITHOUT LIMITATION DIRECT, INDIRECT, COMPENSATORY, SPECIAL, INCIDENTAL, PUNITIVE AND CONSEQUENTIAL DAMAGES.&lt;br /&gt;&lt;br /&gt;I. Title Transfer&lt;br /&gt;CARBON DYNAMICS retains title to parts and complete systems purchased until the said purchaser pays for items in full at which time the title passes to purchaser.&lt;br /&gt;&lt;br /&gt;J. Warranty Service&lt;br /&gt;Carbon Dynamics will cover shipping costs back and forth and replace the part(s) within the first 30 days of receiving your computer system. After 30 days you will be held liable for shipping costs back and forth, and Carbon Dynamics will honor warranty service and replacement only, not for shipping. Digital Storm may also use similar products or similar to new products for all repairs to computer systems order if the product first indicated is out of stock. For example: If a certain Solid State Drive, such as a Corsair Force LS 120GB is out of stock, Carbon Dynamics replaces it with an equivalent such as a  Samsung 840 Evo 120GB SSD. Carbon Dynamics uses an equal product at no cost to the customer. We Do Not Own A Warehouse And Most Of The Hardware Are Bought In Via Secure And Trusted Contacts So Defective Products Will Only Be Replaced Without The Option Of Refunds. &lt;br /&gt;Warranty VOID &amp;amp; DO NOT cover wear or tear, self-negligence &amp;amp; alteration, self-repair, lack of technical expertise, misuse, accident or mishandling, burn marks, warranty seal broken &amp;amp; tampered, or any physical defect / broken part caused by user/during delivery &amp;amp; failure to present proof of purchase&lt;br /&gt;# Goods sold and delivered are not refundable, returnable and exchangeable&lt;br /&gt;Any defective product may Only Be Exchanged under the following CONDITIONS :&lt;br /&gt;•	The system is still under full warranty coverage.&lt;br /&gt;•	The hardware is not damaged by any means due to mishandling of the End-User. &lt;br /&gt;•	Proof of damage and receipt must be issued during the warranty process.&lt;br /&gt;&lt;!--SPOILER DIV--&gt;&lt;/div&gt;&lt;!--SPOILER DIV--&gt;&lt;br /&gt;&lt;br /&gt;&lt;b&gt;&lt;span style='font-family:Arial'&gt;&lt;span style='font-size:14pt;line-height:100%'&gt;&lt;span style='color:red'&gt; Location &lt;/span&gt;&lt;/span&gt;&lt;/span&gt;&lt;/b&gt;&lt;br /&gt;Universiti Malaysia Pahang ( Temporary ) &lt;br /&gt;&lt;br /&gt;Do Provide Us With Feedback, We Will Try To Improve The Thread Arrangement &amp;amp; So Forth To Simplify The Customer&amp;#39;s Purchasing Experience. &lt;!--emo&amp;:flex:--&gt;&lt;img src='http://static.lowyat.net/style_emoticons/default/flex.gif' border='0' style='vertical-align:middle' alt='flex.gif' /&gt;&lt;!--endemo--&gt; &lt;br /&gt;&lt;span style='color:red'&gt;More Kits Are Coming Soon Please Be Patient &lt;/span&gt;  &lt;!--emo&amp;:hyper:--&gt;&lt;img src='http://static.lowyat.net/style_emoticons/default/rclxm9.gif' border='0' style='vertical-align:middle' alt='rclxm9.gif' /&gt;&lt;!--endemo--&gt; &lt;br /&gt;&lt;br /&gt;&lt;br /&gt;We&amp;#39;re back with more affordable gaming kits with the best bang for the buck&amp;#33; Lower end, but still being treated with the utmost professionalism in cable management as well as stress testing to ensure stability and reliability. We Present you...&lt;br /&gt;&lt;br /&gt;&lt;span style='font-size:14pt;line-height:100%'&gt;The Beginner&amp;#39;s Gaming Kit &lt;/span&gt;&lt;br /&gt;&lt;br /&gt;Starting from RM1340 ,things just got a lot better. Note : Hardware prices do fluctuate and the default price is just for mere references. &lt;b&gt;If interested, do drop us a p.m&lt;/b&gt; to achieve the latest price of our Beginner&amp;#39;s Gaming Kit.&lt;br /&gt;&lt;br /&gt;&lt;img src='https://fbcdn-sphotos-f-a.akamaihd.net/hphotos-ak-frc1/t1/1654245_683038078404002_1865506799_n.jpg' border='0' alt='user posted image' /&gt;&lt;br /&gt;&lt;img src='https://fbcdn-sphotos-d-a.akamaihd.net/hphotos-ak-ash3/t1/1798288_683038081737335_500249575_n.jpg' border='0' alt='user posted image' /&gt;&lt;br /&gt;&lt;img src='https://fbcdn-sphotos-b-a.akamaihd.net/hphotos-ak-frc1/t1/10003378_683038085070668_345812749_n.jpg' border='0' alt='user posted image' /&gt;</description>
            <author>O.CModderz</author>
            <category>Garage Sales Archive</category>
            <pubDate>Sun, 09 Mar 2014 02:39:59 +0800</pubDate>
        </item>
        <item>
            <title>[WTS] Custom Medium Gaming System Building Service</title>
            <link>http://forum.lowyat.net/topic/3151411</link>
            <description>&lt;br /&gt;&lt;br /&gt;&lt;br /&gt;&lt;b&gt;&lt;span style='font-family:Times'&gt;&lt;span style='font-size:16pt;line-height:100%'&gt;                                                           Carbon Dynamics&lt;br /&gt;                                                                         Performance Computing - Unprecedented Quality &lt;/span&gt;&lt;/span&gt;&lt;/b&gt;&lt;br /&gt;&lt;br /&gt;&lt;b&gt;&lt;span style='font-family:Arial'&gt;&lt;span style='font-size:14pt;line-height:100%'&gt;&lt;span style='color:red'&gt; About Us &lt;/span&gt;&lt;/span&gt;&lt;/span&gt;&lt;/b&gt;&lt;br /&gt;&lt;!--SPOILER BEGIN--&gt;&lt;div class=&quot;spoilertop&quot; onClick=&quot;openClose('243201011ea98ef9703e0e01eced7de7')&quot; style=&quot;font-weight: bold&quot;&gt;&lt;u&gt;&amp;raquo; Click to show Spoiler - click again to hide... &amp;laquo;&lt;/u&gt;&lt;/div&gt;&lt;div class=&quot;spoilermain&quot; id=&quot;243201011ea98ef9703e0e01eced7de7&quot; style=&quot;display:none&quot;&gt;&lt;!--SPOILER END--&gt;I’m a passionate student who loves building computers which provides boutique system building services for any other enthusiast like me Our mission is to build extreme systems at an affordable rate focusing on performance computing and unprecedented quality in every build we deliver. Ranging from basic systems to hardcore rigs, you name it, we got it. Carbon Dynamics provides the best computing experience one could ever have.  It means a high tier and continuous support system throughout the warranty of your system.  It is true that any company or person can build a good system to suit one’s needs but good isn’t just enough. We want it to be perfect. Many might claim that they could offer a custom system but it doesn’t make sure that you enjoy the whole experience where customization and services are of top priority. We believe clients should have systems with rock solid performance and reliability. &lt;!--SPOILER DIV--&gt;&lt;/div&gt;&lt;!--SPOILER DIV--&gt;&lt;br /&gt;&lt;br /&gt;&lt;br /&gt;&lt;b&gt;&lt;span style='font-family:Arial'&gt;&lt;span style='font-size:14pt;line-height:100%'&gt;&lt;span style='color:red'&gt; Products &amp;amp; Services &lt;/span&gt;&lt;/span&gt;&lt;/span&gt;&lt;/b&gt;&lt;br /&gt;&lt;br /&gt;&lt;!--SPOILER BEGIN--&gt;&lt;div class=&quot;spoilertop&quot; onClick=&quot;openClose('7f1dda602ece83e6d58e4ed1ba571993')&quot; style=&quot;font-weight: bold&quot;&gt;&lt;u&gt;&amp;raquo; Click to show Spoiler - click again to hide... &amp;laquo;&lt;/u&gt;&lt;/div&gt;&lt;div class=&quot;spoilermain&quot; id=&quot;7f1dda602ece83e6d58e4ed1ba571993&quot; style=&quot;display:none&quot;&gt;&lt;!--SPOILER END--&gt;What does Carbon Dynamics have to offer?&lt;br /&gt;-Extreme Personalization (we will provide continuous support throughout the process of building a boutique system with a wide selection of high-end components)&lt;br /&gt;&lt;br /&gt;-Hand built by experienced and Certified Carbon Dynamics System Builders ( anyone could build a pc, but it doesn’t mean that the system is perfect)&lt;br /&gt;&lt;br /&gt;-Hand tested every component to ensure pure performance (every Carbon Dynamics system undergoes at least 72 hours of testing and benchmarks to ensure stability and reliability)&lt;br /&gt;&lt;br /&gt;-Quality and Performance Components (every component in our systems are hand-picked and tested to ensure long lifespan where only the best in quality and performance above our passing standard enters a particular system.&lt;br /&gt;&lt;br /&gt;-Sleek and Elegant system (guess that explains it all)&lt;br /&gt;&lt;br /&gt;-Stylish interior with thermal optimization (custom cabling just makes everything better)&lt;br /&gt;&lt;!--SPOILER DIV--&gt;&lt;/div&gt;&lt;!--SPOILER DIV--&gt;&lt;br /&gt;&lt;br /&gt;&lt;b&gt;&lt;span style='font-family:Arial'&gt;&lt;span style='font-size:14pt;line-height:100%'&gt;&lt;span style='color:red'&gt; System Building Method &lt;/span&gt;&lt;/span&gt;&lt;/span&gt;&lt;/b&gt;&lt;br /&gt;&lt;br /&gt;&lt;!--SPOILER BEGIN--&gt;&lt;div class=&quot;spoilertop&quot; onClick=&quot;openClose('fec4499a2891ada015cb4ad2c3643804')&quot; style=&quot;font-weight: bold&quot;&gt;&lt;u&gt;&amp;raquo; Click to show Spoiler - click again to hide... &amp;laquo;&lt;/u&gt;&lt;/div&gt;&lt;div class=&quot;spoilermain&quot; id=&quot;fec4499a2891ada015cb4ad2c3643804&quot; style=&quot;display:none&quot;&gt;&lt;!--SPOILER END--&gt;•	Each client will start off with a basic kit for different systems where all the parts which meet our minimum requirements have been selected.&lt;br /&gt;•	They will have the option to customize the kits based on our wide selection of hardware for upgrades. &lt;br /&gt;•	Once the kit whether stock or upgraded has been decided, a full payment shall be required in order to continue the process. Do note that hardware prices tend to fluctuate a lot due to exchange rate, etc. so we encourage you to inquire about the pricing of the system before billing in the payment.&lt;br /&gt;•	Once the payment has been made, we will start assembling your system and will be in touch to provide the latest status of the system.  Installation of system comes with the system by default and the necessary software will be installed without the presence of bloatware.   &lt;br /&gt;•	Continuous 72 hour stress test and benchmarking will proceed with total care to ensure constant stability.&lt;br /&gt;•	Once the stress testing has been done, the system will be packaged and sent to the end-user though it may take up to 20 days to complete the whole stress test and building process before proceeding with shipping.&lt;!--SPOILER DIV--&gt;&lt;/div&gt;&lt;!--SPOILER DIV--&gt;&lt;br /&gt;&lt;br /&gt;&lt;b&gt;&lt;span style='font-family:Arial'&gt;&lt;span style='font-size:14pt;line-height:100%'&gt;&lt;span style='color:red'&gt; Purchasing Method, Payment Terms &amp;amp; Shipping &lt;/span&gt;&lt;/span&gt;&lt;/span&gt;&lt;/b&gt;&lt;br /&gt;&lt;!--SPOILER BEGIN--&gt;&lt;div class=&quot;spoilertop&quot; onClick=&quot;openClose('80ab752f13ea9fbe2dc5bbc8b29b1254')&quot; style=&quot;font-weight: bold&quot;&gt;&lt;u&gt;&amp;raquo; Click to show Spoiler - click again to hide... &amp;laquo;&lt;/u&gt;&lt;/div&gt;&lt;div class=&quot;spoilermain&quot; id=&quot;80ab752f13ea9fbe2dc5bbc8b29b1254&quot; style=&quot;display:none&quot;&gt;&lt;!--SPOILER END--&gt;•	Bank In / Wire Transfer to : Maybank available. Credit Card Purchase is not available, for now…&lt;br /&gt;•	Shipping &lt;br /&gt;&lt;br /&gt;#&lt;a href='http://track.kangaroo.com.my/' target='_blank'&gt;Kangaroo Tracking&lt;/a&gt;&lt;br /&gt;&lt;br /&gt;•	We currently don’t have a stationary COD location available so all of our system will be shipped out to the customers via Kangaroo Courier. Delivery is within the next 1-2 working day/s however it will take longer if the shipping address is well beyond 40km from the main branch for certain locations. For more information, please click the link included.  Some branches will require at least 5 different parcels to your location in order to proceed with the shipping process. Do contact the branch which collected your system for more information on the current status about it.&lt;br /&gt;&lt;a href='http://www.kangaroo.com.my/branches.html' target='_blank'&gt;http://www.kangaroo.com.my/branches.html&lt;/a&gt;&lt;br /&gt;•	 Shipment is covered by the default insured value of each courier. Any additional insurance required is the client’s responsibility. Any loss or damage occurred during shipment is at the client’s own risk. We are Not Responsible for any Loss Or Damage That Occurred During Shipment but we will make sure that every single system is packaged as neatly as possible.&lt;br /&gt;•	Full payment is required before building the system and the shipping cost will be provided once the system has been completed.&lt;br /&gt;&lt;br /&gt;&lt;!--SPOILER DIV--&gt;&lt;/div&gt;&lt;!--SPOILER DIV--&gt;&lt;br /&gt;&lt;br /&gt;&lt;b&gt;&lt;span style='font-family:Arial'&gt;&lt;span style='font-size:14pt;line-height:100%'&gt;&lt;span style='color:red'&gt; Contact Method &lt;/span&gt;&lt;/span&gt;&lt;/span&gt;&lt;/b&gt;&lt;br /&gt;&lt;!--SPOILER BEGIN--&gt;&lt;div class=&quot;spoilertop&quot; onClick=&quot;openClose('c806a597c57c048d9533dd30bd05982d')&quot; style=&quot;font-weight: bold&quot;&gt;&lt;u&gt;&amp;raquo; Click to show Spoiler - click again to hide... &amp;laquo;&lt;/u&gt;&lt;/div&gt;&lt;div class=&quot;spoilermain&quot; id=&quot;c806a597c57c048d9533dd30bd05982d&quot; style=&quot;display:none&quot;&gt;&lt;!--SPOILER END--&gt;•	Feel free to drop us a private message (PM) or via facebook at www.facebook.com/CarbonDynamics&lt;!--SPOILER DIV--&gt;&lt;/div&gt;&lt;!--SPOILER DIV--&gt;&lt;br /&gt;&lt;br /&gt;&lt;b&gt;&lt;span style='font-family:Arial'&gt;&lt;span style='font-size:14pt;line-height:100%'&gt;&lt;span style='color:red'&gt; Terms &amp;amp; Conditions &lt;/span&gt;&lt;/span&gt;&lt;/span&gt;&lt;/b&gt; EXTREMELY IMPORTANT, READ BEFORE PURCHASING&lt;br /&gt;&lt;!--SPOILER BEGIN--&gt;&lt;div class=&quot;spoilertop&quot; onClick=&quot;openClose('9dd4753f005f068d4616c81f637cbc0b')&quot; style=&quot;font-weight: bold&quot;&gt;&lt;u&gt;&amp;raquo; Click to show Spoiler - click again to hide... &amp;laquo;&lt;/u&gt;&lt;/div&gt;&lt;div class=&quot;spoilermain&quot; id=&quot;9dd4753f005f068d4616c81f637cbc0b&quot; style=&quot;display:none&quot;&gt;&lt;!--SPOILER END--&gt;&lt;br /&gt;A. Disclaimer&lt;br /&gt;•	Customer agrees that Carbon Dynamics is not liable for mismatched product pictures or mistakes in product information. Carbon Dynamics reserves the right to change products and specifications and those listed on the Site may not be current. Customer agrees to verify the specifications of each product with the order. Carbon Dynamics is only responsible for products named on the invoice.&lt;br /&gt;•	Our sales representatives are not authorized to make any representations or promises related to any product or services that exceed these terms and conditions and the warranty. Any additional provisions to your purchase must be made in writing signed by an officer of Carbon Dynamics&lt;br /&gt;•	Customer agrees that each item in a multi-item purchase from Carbon Dynamics shall be treated independently unless stated otherwise in the memo section of their order. That is, defect, replacement, and cancellation of one item does not constitute the voiding of the entire purchase. Each item shall be considered independently for warranty or refund purposes unless the customer has stated otherwise in the invoice memo.&lt;br /&gt;•	Customer agrees that shipping costs and expenses will not be refunded once we ship.&lt;br /&gt;•	It is the Customer&amp;#39;s responsibility to look over their email confirmation and make sure all shipping, billing and item purchased are correct. If you do not get an email confirmation, call us to see if the order went through. Do not submit multiple orders or you will end up paying full restocking and shipping fees.&lt;br /&gt;•	Order cancellation will be accepted over the web (only before the order is processed). It cannot be done over email. You can confirm order cancellation by checking the order status via PM. Once the system has entered stage1, Order Cancellation Shall No Longer Be Accepted so please be in close contact with us as frequent as possible.&lt;br /&gt;•	Material fee for boxes, transportation, etc. are included in the shipping fee. Customer shall not be liable for additional shipping charges for purchases Carbon Dynamics chooses to ship in multiple packages unless they request and agree to shipping upgrades and upgrade fees. Carbon Dynamics does include shipping insurance with every shipment.&lt;br /&gt;•	&amp;quot;Customer&amp;quot; agrees that Carbon Dynamics will not liable for shipper&amp;#39;s shipping delays.&lt;br /&gt;&lt;br /&gt;B. Making Purchases&lt;br /&gt;If you wish to purchase products offered on the thread, you will be asked to supply certain information, including but not limited to other payment information. You agree that all information you provide to Carbon Dynamics will be accurate complete and current. You agree to pay all charges incurred by authorized users of your account or other payment mechanism at the prices in effect when such charges are incurred. You will also be responsible for paying any applicable taxes, and shipping and handling charges relating to your purchases.&lt;br /&gt;&lt;br /&gt;C. Where We Ship&lt;br /&gt;We ship to any physical address that the shipper/courier can ship to domestically only (Peninsula Malaysia). Due to the number of wrong addresses from customers, we now charge the face value that the shipper/courier charges us to reroute your package if you did not enter the address correctly. This charge is anywhere from RM25-RM90 and you agree if your address is wrong, Carbon Dynamics is authorized to charge you for these fees.&lt;br /&gt;&lt;br /&gt;D. When We Ship&lt;br /&gt;Orders received are usually processed the same day for product build. Products are shipped only after build which can take up to&lt;b&gt; 20 days on a standard basis ( Only Free On Weekends )&lt;/b&gt;. Your order may be delayed if your ship to address does not match what your credit card issuer has on their file. If you choose next day air service, it does not necessarily mean you will get it the next day from the order date, it means that you will get it the next day from the date we ship the order. Carbon Dynamics reserves the right at any time after receipt of your order to delay your order for any reason.&lt;br /&gt;&lt;br /&gt;E. Shipping Delays&lt;br /&gt;Once an order is shipped, it is up to the shipper courier to deliver the products; we will not be able to stop the shipment once it is shipped. Another delay is if there is no one to sign for the package, every package we ship usually requires a signature, if a package is returned to us because no one was available to sign for it or the address was input incorrectly at the time you enter the order, you will be charged again to ship it out a second time.&lt;br /&gt;&lt;br /&gt;F. Pricing &amp;amp; Typographical Errors&lt;br /&gt;Due to the fast pace of the computer industry, all prices are subject to change without notice. We make every effort to list the most accurate, up to the minute information. Despite our efforts, some items on our website may be miss-priced. If a product is listed at an incorrect price due to a typographical, photographical, or technical error or error in pricing from our vendors, Carbon Dynamics reserves the right to refuse or cancel any orders placed for a product listed at the incorrect price. Due to the volatility in pricing for computer products, we do not match competitor&amp;#39;s pricing and we will not offer price protection beyond the 24hours of purchase. Example: If Intel drops the price of a processor 5 days after your purchase, that is beyond our control and our cost for that same processor when we shipped is also much higher than our current selling price. We will not be able to refund the difference since we had to purchase the processor at a much higher cost to send it to you when you placed your order.&lt;br /&gt;&lt;br /&gt;G. Order Acceptance Policy&lt;br /&gt;Your receipt of an electronic or phone order confirmation does not signify our acceptance of your order. Digital Storm reserves the right at any time after receipt of your order to accept or decline your order for any reason.&lt;br /&gt;&lt;br /&gt;H. DISCLAIMER AND LIMITATION OF LIABILITY AS TO PRODUCTS SOLD&lt;br /&gt;&lt;br /&gt;YOU AGREE THAT THE SOLE AND EXCLUSIVE MAXIMUM LIABILITY TO CARBON DYNAMICS. ARISING FROM ANY PRODUCT SOLD BY CARBON DYNAMICS SHALL BE THE PRICE OF THE PRODUCT ORDERED. IN NO EVENT SHALL CARBON DYNAMICS AND REPRESENTATIVES BE LIABLE FOR SPECIAL, INDIRECT, CONSEQUENTIAL, OR PUNITIVE DAMAGES RELATED TO PRODUCT SOLD.&lt;br /&gt;1. DISCLAIMER AND LIMITATION OF LIABILITY AS TO THE CARBON DYNAMICS FACEBOOK PAGE. THE CARBON DYNAMICS FACEBOOK PAGE AND THE MATERIALS THEREIN ARE PROVIDED “AS IS”. CARBON DYNAMICS. MAKES NO REPRESENTATIONS OR WARRANTIES, EITHER EXPRESS OR IMPLIED, OF ANY KIND WITH RESPECT TO THE CARBON DYNAMICS FACEBOOK PAGE, THEIR OPERATION, CONTENTS, INFORMATION, OR MATERIALS ON THE SITE. CARBON DYNAMICS EXPRESSLY DISCLAIMS ALL WARRANTIES, EXPRESS OR IMPLIED, OF ANY KIND WITH RESPECT TO THE SITE OR THEIR USE, INCLUDING BUT NOT LIMITED TO ANY IMPLIED WARRANTY OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE. YOU AGREE THAT CARBON DYNAMICS, ITS DIRECTORS, OFFICERS, EMPLOYEES OR OTHER REPRESENTATIVES SHALL NOT BE LIABLE FOR DAMAGES ARISING FROM THE OPERATION OR CONTENT. YOU AGREE THAT THIS LIMITATION OF LIABILITY IS COMPREHENSIVE AND APPLIES TO ALL DAMAGES OF ANY KIND, INCLUDING WITHOUT LIMITATION DIRECT, INDIRECT, COMPENSATORY, SPECIAL, INCIDENTAL, PUNITIVE AND CONSEQUENTIAL DAMAGES.&lt;br /&gt;&lt;br /&gt;I. Title Transfer&lt;br /&gt;CARBON DYNAMICS retains title to parts and complete systems purchased until the said purchaser pays for items in full at which time the title passes to purchaser.&lt;br /&gt;&lt;br /&gt;J. Warranty Service&lt;br /&gt;Carbon Dynamics will cover shipping costs back and forth and replace the part(s) within the first 30 days of receiving your computer system. After 30 days you will be held liable for shipping costs back and forth, and Carbon Dynamics will honor warranty service and replacement only, not for shipping. Digital Storm may also use similar products or similar to new products for all repairs to computer systems order if the product first indicated is out of stock. For example: If a certain Solid State Drive, such as a Corsair Force LS 120GB is out of stock, Carbon Dynamics replaces it with an equivalent such as a  Samsung 840 Evo 120GB SSD. Carbon Dynamics uses an equal product at no cost to the customer. We Do Not Own A Warehouse And Most Of The Hardware Are Bought In Via Secure And Trusted Contacts So Defective Products Will Only Be Replaced Without The Option Of Refunds. &lt;br /&gt;Warranty VOID &amp;amp; DO NOT cover wear or tear, self-negligence &amp;amp; alteration, self-repair, lack of technical expertise, misuse, accident or mishandling, burn marks, warranty seal broken &amp;amp; tampered, or any physical defect / broken part caused by user/during delivery &amp;amp; failure to present proof of purchase&lt;br /&gt;# Goods sold and delivered are not refundable, returnable and exchangeable&lt;br /&gt;Any defective product may Only Be Exchanged under the following CONDITIONS :&lt;br /&gt;•	The system is still under full warranty coverage.&lt;br /&gt;•	The hardware is not damaged by any means due to mishandling of the End-User. &lt;br /&gt;•	Proof of damage and receipt must be issued during the warranty process.&lt;br /&gt;&lt;!--SPOILER DIV--&gt;&lt;/div&gt;&lt;!--SPOILER DIV--&gt;&lt;br /&gt;&lt;br /&gt;&lt;b&gt;&lt;span style='font-family:Arial'&gt;&lt;span style='font-size:14pt;line-height:100%'&gt;&lt;span style='color:red'&gt; Location &lt;/span&gt;&lt;/span&gt;&lt;/span&gt;&lt;/b&gt;&lt;br /&gt;Universiti Malaysia Pahang &lt;br /&gt;&lt;br /&gt;Do Provide Us With Feedback, We Will Try To Improve The Thread Arrangement &amp;amp; So Forth To Simplify The Customer&amp;#39;s Purchasing Experience. &lt;!--emo&amp;:flex:--&gt;&lt;img src='http://static.lowyat.net/style_emoticons/default/flex.gif' border='0' style='vertical-align:middle' alt='flex.gif' /&gt;&lt;!--endemo--&gt; &lt;br /&gt;&lt;span style='color:red'&gt;More Kits Are Coming Soon Please Be Patient &lt;/span&gt;  &lt;!--emo&amp;:hyper:--&gt;&lt;img src='http://static.lowyat.net/style_emoticons/default/rclxm9.gif' border='0' style='vertical-align:middle' alt='rclxm9.gif' /&gt;&lt;!--endemo--&gt; &lt;br /&gt;&lt;br /&gt;&lt;br /&gt; &lt;!--emo&amp;:hyper:--&gt;&lt;img src='http://static.lowyat.net/style_emoticons/default/rclxm9.gif' border='0' style='vertical-align:middle' alt='rclxm9.gif' /&gt;&lt;!--endemo--&gt; &lt;span style='font-size:14pt;line-height:100%'&gt;Basic Mid Tier Gaming Starter Kit   A.K.A Predator &lt;/span&gt;&lt;br /&gt;&lt;br /&gt;You will start from this basic kit. &lt;br /&gt;&lt;b&gt;Custom Sleeving &amp;amp; Lighting Upon Request = Added Price &lt;/b&gt;&lt;br /&gt;&lt;img src='https://fbcdn-sphotos-g-a.akamaihd.net/hphotos-ak-ash3/t1/1779291_681899891851154_791633167_n.jpg' border='0' alt='user posted image' /&gt;&lt;br /&gt;&lt;br /&gt;-You may choose to UPGRADE from our selection of parts. ( DO ASK FOR THE LATEST PRICING )&lt;br /&gt;&lt;br /&gt;&lt;br /&gt;&lt;img src='https://fbcdn-sphotos-b-a.akamaihd.net/hphotos-ak-frc1/t1/1891028_676629042378239_252806083_n.jpg' border='0' alt='user posted image' /&gt;&lt;br /&gt;&lt;br /&gt;&lt;br /&gt;&lt;img src='https://fbcdn-sphotos-h-a.akamaihd.net/hphotos-ak-frc3/t1/1012559_676629049044905_1152361766_n.jpg' border='0' alt='user posted image' /&gt;&lt;br /&gt;&lt;br /&gt;&lt;br /&gt;&lt;img src='https://fbcdn-sphotos-e-a.akamaihd.net/hphotos-ak-ash3/t1/1926764_676629052378238_850062239_n.jpg' border='0' alt='user posted image' /&gt;&lt;br /&gt;&lt;br /&gt;&lt;br /&gt;&lt;img src='https://fbcdn-sphotos-c-a.akamaihd.net/hphotos-ak-frc3/t1/1926637_676629079044902_573981796_n.jpg' border='0' alt='user posted image' /&gt;&lt;br /&gt;&lt;br /&gt;&lt;br /&gt;&lt;img src='https://fbcdn-sphotos-a-a.akamaihd.net/hphotos-ak-frc3/t1/1899960_676629085711568_1251327381_n.jpg' border='0' alt='user posted image' /&gt;</description>
            <author>O.CModderz</author>
            <category>Garage Sales Archive</category>
            <pubDate>Tue, 04 Mar 2014 23:38:12 +0800</pubDate>
        </item>
        <item>
            <title>UPU 2013 Official Thread</title>
            <link>http://forum.lowyat.net/topic/2815696</link>
            <description>&lt;!--emo&amp;:D--&gt;&lt;img src='http://static.lowyat.net/style_emoticons/default/biggrin.gif' border='0' style='vertical-align:middle' alt='biggrin.gif' /&gt;&lt;!--endemo--&gt;  To all SPM 2012 leavers, kindly list out your course offers by local universities and/or premier politechnics. Feel free to discuss anything relevant.&lt;br /&gt;UTM&lt;br /&gt;Katekyo hitman (electronic engineering diploma ) Not Attending&lt;br /&gt;UPM&lt;br /&gt;&lt;br /&gt;UITM&lt;br /&gt;-aimnjhri ( Asasi Sains ) maybe&lt;br /&gt;UPNM&lt;br /&gt;&lt;br /&gt;UMP&lt;br /&gt;-Yeemin95 (Diploma Mechanical Engineering ) Probably not attending&lt;br /&gt;-hihichew ( Diploma Computer Science ) Not attending&lt;br /&gt;-O.CModderz (Diploma Civil Engineering) maybe&lt;br /&gt;-MarkedOne (Diploma Mechanical Engineering ) maybe&lt;br /&gt;Politeknik&lt;br /&gt;-KeroGo (Diploma Electronic Engineering, Communication ) Attending&lt;br /&gt;UNIMAP&lt;br /&gt;&lt;br /&gt;UPSi&lt;br /&gt;-jambanmu ( Diploma Mathematics ) not attending&lt;br /&gt;etc.</description>
            <author>O.CModderz</author>
            <category>Education Essentials</category>
            <pubDate>Fri, 17 May 2013 16:18:16 +0800</pubDate>
        </item>
        <item>
            <title>UTAR Kampar Foundation 2013</title>
            <link>http://forum.lowyat.net/topic/2783784</link>
            <description>Hello everyone, is there anyone who&amp;#39;s going to UTAR kampar for foundation in science course during the May 2013 intake? Maybe we could meet up on the first day of our orientation &lt;!--emo&amp;:P--&gt;&lt;img src='http://static.lowyat.net/style_emoticons/default/tongue.gif' border='0' style='vertical-align:middle' alt='tongue.gif' /&gt;&lt;!--endemo--&gt;</description>
            <author>O.CModderz</author>
            <category>Education Essentials</category>
            <pubDate>Mon, 22 Apr 2013 15:36:21 +0800</pubDate>
        </item>
        <item>
            <title>4GB ram installed, only 2 GB usable</title>
            <link>http://forum.lowyat.net/topic/2157075</link>
            <description>Hello guys, I just re-installed my Windows 7 64 bit 3 days ago and before that I keep plugging the CPU, RAM and GPU in &amp;amp; out a few times due to some clearance issue with my CPU Heatsink. After that, I felt weird because it is not running as fast as usual so I checked the Task manager.  &lt;!--emo&amp;:blink:--&gt;&lt;img src='http://static.lowyat.net/style_emoticons/default/blink.gif' border='0' style='vertical-align:middle' alt='blink.gif' /&gt;&lt;!--endemo--&gt; ftw&lt;br /&gt;&lt;img src='https://lh3.googleusercontent.com/-cBw6EVAhsT0/TvBQx-YP3eI/AAAAAAAAAZ0/UYcbNU8yrxE/s800/Untitled.png' border='0' alt='user posted image' /&gt;&lt;br /&gt;&lt;br /&gt;&lt;br /&gt;so I reseated the CPU....again... re-arrange the RAM modules. but here&amp;#39;s a flinch. When I place only one ram module, the DRAM led lights up and no boot, no post&lt;br /&gt;&lt;img src='https://lh4.googleusercontent.com/-MtvDk1mLkgY/TvBSB4eg96I/AAAAAAAAAaE/gThNUMXZ_X0/s912/IMG_1311.JPG' border='0' alt='user posted image' /&gt;&lt;br /&gt;when I place 2 memory modules, it worked  &lt;!--emo&amp;:blink:--&gt;&lt;img src='http://static.lowyat.net/style_emoticons/default/blink.gif' border='0' style='vertical-align:middle' alt='blink.gif' /&gt;&lt;!--endemo--&gt; &lt;br /&gt;&lt;img src='https://lh5.googleusercontent.com/-Q5nZfAPNQqg/TvBSDVBfHiI/AAAAAAAAAaM/rjthwlqE1l0/s912/IMG_1312.JPG' border='0' alt='user posted image' /&gt;&lt;br /&gt;&lt;br /&gt;here&amp;#39;s the view from BIOS&lt;br /&gt;&lt;img src='https://lh6.googleusercontent.com/-OYhQcarw3XU/TvBRBVBwmWI/AAAAAAAAAZ8/FAMlnNuNSQo/s912/IMG_1305.JPG' border='0' alt='user posted image' /&gt;&lt;br /&gt;&lt;br /&gt;My memory is Corsair XMS3 2x2Gb module&lt;br /&gt;&lt;br /&gt;Help?</description>
            <author>O.CModderz</author>
            <category>Hardware</category>
            <pubDate>Tue, 20 Dec 2011 17:22:14 +0800</pubDate>
        </item>
        <item>
            <title>Where can I get Bolt Thru Kits</title>
            <link>http://forum.lowyat.net/topic/2150166</link>
            <description>Hi all, does anyone know where can I buy come bolt thru kit near Lowyat Plaza / Jalan Pasar? &lt;br /&gt;&lt;br /&gt;something like this &lt;a href='http://www.thermalright.com/new_a_page/support/installation/1156_btk.htm' target='_blank'&gt;http://www.thermalright.com/new_a_page/sup...on/1156_btk.htm&lt;/a&gt;  fits 1156 socket one</description>
            <author>O.CModderz</author>
            <category>Hardware</category>
            <pubDate>Thu, 15 Dec 2011 14:32:25 +0800</pubDate>
        </item>
        <item>
            <title>Has anyone tried the Spire Gemini yet?</title>
            <link>http://forum.lowyat.net/topic/2136559</link>
            <description>Has anyone on this forum tried the spire gemini yet? The one sold by linglong. How it it?</description>
            <author>O.CModderz</author>
            <category>Hardware</category>
            <pubDate>Mon, 05 Dec 2011 18:02:57 +0800</pubDate>
        </item>
        <item>
            <title>[Scratch / Case Mod Worklog] Project : Asphalt , B</title>
            <link>http://forum.lowyat.net/topic/2135227</link>
            <description>&lt;img src='https://lh3.googleusercontent.com/-odmTAeQBwGI/Tsi2hxUHj4I/AAAAAAAAAQo/Z5rEIWa6Sgw/s640/cracked_asphalt.jpg' border='0' alt='user posted image' /&gt;&lt;br /&gt;Intro&lt;br /&gt;Hay all, a modding amature on a simple black &amp;amp; white build / mod on my used and abused HAF 922. IMO, red &amp;amp; black seems a little bit common so i guess I&amp;#39;ll just do a B &amp;amp; W instead. All the parts of the computer are the same, no upgrades, no downgrades, some clean up of the dust and....&lt;br /&gt;enjoy &lt;br /&gt;&lt;br /&gt;Concept&lt;br /&gt;-A black and white case with a modern yet clean look to it.&lt;br /&gt;&lt;br /&gt;-inspired by some B &amp;amp; W builds eg. Project : Aspros , Project 600T 360 , Project Alduin and Project WAR HARDENED &lt;a href='http://www.overclock.net/t/1155067/project-war-hardenend' target='_blank'&gt;http://www.overclock.net/t/1155067/project-war-hardenend&lt;/a&gt;&lt;br /&gt;&lt;br /&gt;- Positive pressure case for lower MB, CPU &amp;amp; GPU temps?&lt;br /&gt;&lt;br /&gt;-Clean look ( hide cable management )&lt;br /&gt;&lt;br /&gt;-Improve case airflow by reducing some stuff:p&lt;br /&gt;&lt;br /&gt;- Of course, the clean design of the Corsair 600T , Silverstone TJ 07, Silverstone Raven and maybe the Silverstone TJ 11 ( Depending on the parts I&amp;#39;ll do some modifications on.)&lt;br /&gt;&lt;br /&gt;Specs&lt;br /&gt;-Cooler Master HAF 922&lt;br /&gt;&lt;img src='https://lh5.googleusercontent.com/-vu07cm_-sqA/TsismyNBKPI/AAAAAAAAAPg/wVXtL5_6wgE/s912/IMG_1186.JPG' border='0' alt='user posted image' /&gt;&lt;br /&gt;- Intel Core I5 760 2.8Ghz&lt;br /&gt;&lt;img src='https://lh4.googleusercontent.com/-I26qwTHX3Wg/Tsis9qbNB3I/AAAAAAAAAPs/-goa9DKrv9I/s912/IMG_1191.JPG' border='0' alt='user posted image' /&gt;&lt;br /&gt;-ASUS Maximus III Formula&lt;br /&gt;&lt;img src='https://lh5.googleusercontent.com/-sh8TaxcORtk/Tsisu8ZNmxI/AAAAAAAAAPk/eyDvZSi78K4/s912/IMG_1188.JPG' border='0' alt='user posted image' /&gt;&lt;br /&gt;-2x2GB Corsair XMS 3 RAM Modules&lt;br /&gt;&lt;br /&gt;-Cooler Master V8&lt;br /&gt;&lt;br /&gt;- Cooler Master M600 Power supply&lt;br /&gt;&lt;br /&gt;-ASUS ENGTX 460 TOP 1GB&lt;br /&gt;&lt;br /&gt;-4 x Cooler Master 120mm Sickle Fan&lt;br /&gt;&lt;br /&gt;-2 x Cooler Master Mega Flow 200mm fan&lt;br /&gt;&lt;br /&gt;-1 x Cooler Master Default 120mm 46 cfm fan&lt;br /&gt;&lt;br /&gt;- Western Digital Caviar Black 1TB HDD&lt;br /&gt;&lt;br /&gt;- Hitachi Deskstar 160GB HDD&lt;br /&gt;&lt;br /&gt;-ASUS DRW-24B1ST DVD Drive...meh, its 2012 next year  but still kept for software installation and backup DVD&amp;#39;s0&lt;br /&gt;&lt;br /&gt;&lt;br /&gt;&lt;br /&gt;Materials (no pics yet )&lt;br /&gt;- 1 x 1 m squared clear acrylic&lt;br /&gt;- 0.02 mm thick aluminium sheet&lt;br /&gt;- home made aluminium modders mesh&lt;br /&gt;- screws&lt;br /&gt;- Primer aerosol paint&lt;br /&gt;- White aerosol paint&lt;br /&gt;- Black aerosol paint&lt;br /&gt;- Acrylic cement&lt;br /&gt;- Thermal Paste&lt;br /&gt;- Wood (again??&amp;#33;&amp;#33;) probably &lt;br /&gt;more to come .........&lt;br /&gt;</description>
            <author>O.CModderz</author>
            <category>Worklogs</category>
            <pubDate>Sun, 04 Dec 2011 19:26:34 +0800</pubDate>
        </item>
        <item>
            <title>Where can I buy Dremel?</title>
            <link>http://forum.lowyat.net/topic/0</link>
            <description></description>
            <category>Hardware</category>
            <pubDate>Thu, 01 Jan 1970 07:30:00 +0800</pubDate>
        </item>
        <item>
            <title>Where can I buy Dremel?</title>
            <link>http://forum.lowyat.net/topic/2114461</link>
            <description>Is there any place that I can buy a Dremel® 100 Series Rotary Tool Kit  at Penang, Kulim or Taiping? cuz the one from Ace Hardware is kinda expensive ...</description>
            <author>O.CModderz</author>
            <category>Casings and Modifications</category>
            <pubDate>Fri, 18 Nov 2011 19:31:10 +0800</pubDate>
        </item>
        <item>
            <title>Where to buy rotary cutting attachment for Bosch</title>
            <link>http://forum.lowyat.net/topic/2112669</link>
            <description>Hi, I&amp;#39;m new to the forum and I&amp;#39;m doing a metal cutting project recently and I was wondering if I can buy a metal cutting rotary attachment in Penang for my Bosch drill, I live in penang &lt;!--emo&amp;:D--&gt;&lt;img src='http://static.lowyat.net/style_emoticons/default/biggrin.gif' border='0' style='vertical-align:middle' alt='biggrin.gif' /&gt;&lt;!--endemo--&gt; &lt;br /&gt;&lt;br /&gt;Thanks in advance</description>
            <author>O.CModderz</author>
            <category>Hardware</category>
            <pubDate>Thu, 17 Nov 2011 14:03:25 +0800</pubDate>
        </item>
    </channel>
</rss>
