            <title>Late Delivery Penalty for Vacant Possession</title>
            <link>http://forum.lowyat.net/topic/2991389</link>
            <description>I really need advise on below as I do not want to be short-change as a buyer.&lt;br /&gt;&lt;br /&gt;1st Question:&lt;br /&gt;If my S&amp;amp;P was dated 14 July 2011, completion date suppose to be within 24month. Now, the actual completion date was extended beyond 14 July 2013(more than 24month). As such, I am entitled for the late delivery charge which I want to claim from developer 10% per annum as specified in the conditions of the S&amp;amp;P. What is the effective date for the late delivery charge that I am suppose to be getting from the inefficient developer.&lt;br /&gt;A. Start date 15-Jul-2013 till the day I signed the acceptance form OR&lt;br /&gt;B. Start date 15-Jul-2013 till the day I signed the acceptance form with keys handed by developer OR&lt;br /&gt;C. Start date 15-Jul-2013 till the day as dated in the CCC notification letter from developer OR&lt;br /&gt;D. Start date 15-Jul-2013 till the day as dated in the letter of vacant possession sent by developer OR&lt;br /&gt;E. Start date 15-Jul-2103 till the last day (14 days after VP notice letter)&lt;br /&gt;&lt;br /&gt;*I realize the CCC was issued much earlier than the date stated in the VP notification letter sent by Developer (at least earlier by 3 weeks). FYI. my financier has released full amount as per the final progress billing.&lt;br /&gt;&lt;br /&gt;2nd Question:&lt;br /&gt;The developer suppose to prepare and ready the cheque(full amount of late delivery penalty) on &lt;br /&gt;A. The day I sign the acceptance letter OR &lt;br /&gt;B. Send the cheque at later date after I sign the acceptance form (any specific time frame by law?) OR &lt;br /&gt;C. Prepare and send the cheque to me first prior to arrange for signing for acceptance? (I believe this option is very unlikely)&lt;br /&gt;&lt;br /&gt;If answer is B, any law that the developer must comply and to pay the late delivery charge within certain period (i.e 14 days) or else legal action can be taken against them? I am afraid if I happen to accept Option B, the developer will take their own sweet time or delay in paying the amount?&lt;br /&gt;</description>
            <author>Limamila</author>
            <category>Property Talk</category>
            <pubDate>Fri, 11 Oct 2013 17:32:27 +0800</pubDate>
        </item>
        <item>
            <title>Bamboo poles for outdoor fence</title>
            <link>http://forum.lowyat.net/topic/2874035</link>
            <description>Where can get this bamboo poles as shown in the picture below. Plan to use it for DIY fencing. Any idea where to get in Klang Valley area or Melaka?&lt;br /&gt;&lt;br /&gt;[attachmentid=3521066]&lt;br /&gt;</description>
            <author>Limamila</author>
            <category>Home Renovations and Interior Design</category>
            <pubDate>Fri, 05 Jul 2013 13:43:26 +0800</pubDate>
        </item>
        <item>
            <title>How to test Electrical Points during VP?</title>
            <link>http://forum.lowyat.net/topic/2857328</link>
            <description>How do I test all the electrical points(light, fan, power, heater, aircond, auto gate, bell) when no appliances are installed yet during house VP? What is the easiest and safe way to test?</description>
            <author>Limamila</author>
            <category>Home Renovations and Interior Design</category>
            <pubDate>Fri, 21 Jun 2013 12:14:35 +0800</pubDate>
        </item>
        <item>
            <title>Sink, Basin, Door (taken out from new house)</title>
            <link>http://forum.lowyat.net/topic/2836773</link>
            <description>My house is a new unit from developer. I have plan to replace the developer&amp;#39;s standard spec of the room door, kitchen sink and toilet basins. Anyone knows where to sell these or any shops that accept trade-in by replacing the items? Thank you.</description>
            <author>Limamila</author>
            <category>Home Renovations and Interior Design</category>
            <pubDate>Tue, 04 Jun 2013 19:02:48 +0800</pubDate>
        </item>
        <item>
            <title>Hack the separation wall of 2 condo units</title>
            <link>http://forum.lowyat.net/topic/2486215</link>
            <description>I intend to buy a neighbour condo directly besides my current unit. I plan to hack the inner wall separating my unit and the neighbour unit. My question here is if this is allowed by the authority and is it safe to do so? Anybody here has done this before? Please advise on your thoughts.</description>
            <author>Limamila</author>
            <category>Home Renovations and Interior Design</category>
            <pubDate>Tue, 28 Aug 2012 12:38:30 +0800</pubDate>