<?xml version="1.0" encoding="utf-8"?>
<!-- generator="FeedCreator 1.7.2" -->
<rss version="2.0">
    <channel>
        <title>Lowyat.NET: Latest topics by WID_Kash</title>
        <description></description>
        <link>http://forum.lowyat.net/</link>
        <lastBuildDate>Sat, 14 Nov 2026 16:00:05 +0800</lastBuildDate>
        <generator>FeedCreator 1.7.2</generator>
        <item>
            <title>3 things I wish I knew before starting my reno (sh</title>
            <link>http://forum.lowyat.net/topic/5574093</link>
            <description>Went through a renovation recently and picked up a few things the hard way. Posting in case it saves someone else the headache.&lt;br /&gt;&lt;br /&gt;&lt;b&gt;1. Get the scope in writing — not just the quote total.&lt;/b&gt;&lt;br /&gt;&lt;br /&gt;A quote that just says &amp;quot;kitchen renovation — RM18,000&amp;quot; doesn&amp;#39;t tell you what&amp;#39;s actually included. Ask them to write it out properly: what materials, what brand or type where it matters, and what&amp;#39;s NOT included. If it&amp;#39;s not written down, it&amp;#39;s not agreed — and you have nothing to point back to later if something&amp;#39;s different from what you expected.&lt;br /&gt;&lt;br /&gt;&lt;b&gt;2. Pay in stages tied to progress, not one big amount upfront.&lt;/b&gt;&lt;br /&gt;&lt;br /&gt;Most disputes I&amp;#39;ve heard about (and read here) don&amp;#39;t come from bad contractors — they come from no plan. Paying 50% upfront with nothing tying the next payment to actual progress means you have nothing to fall back on if things slow down or go sideways — you&amp;#39;ve already paid, so there&amp;#39;s no pressure on them to keep moving. Instead, stage it: a deposit first, then payments only after you&amp;#39;ve seen each stage actually completed.&lt;br /&gt;&lt;br /&gt;&lt;b&gt;3. Have a checklist for what to inspect before each payment.&lt;/b&gt;&lt;br /&gt;&lt;br /&gt;Things like electrical points, waterproofing before tiling, alignment before final finishes — small stuff that&amp;#39;s expensive to fix after the fact. A 10-minute check before you release payment saves a lot of pain later.&lt;br /&gt;&lt;br /&gt;None of this is about &amp;quot;bad contractors&amp;quot; — most are just working without a system, and homeowners don&amp;#39;t know what to ask for either. Written scope + staged payments fixes most of it.&lt;br /&gt;&lt;br /&gt;If anyone wants a ready-made version of this (checklist + payment plan template), I found WID&amp;#39;s Essential Renovation Kit (RM99, Condo or Landed version) — useful starting point if you don&amp;#39;t want to build one from scratch: wisdintel.com&lt;br /&gt;&lt;br /&gt;Happy to answer questions if anyone&amp;#39;s mid-reno and wants a second opinion on their quote structure.</description>
            <author>WID_Kash</author>
            <category>Home Renovations and Interior Design</category>
            <pubDate>Fri, 14 Aug 2026 19:08:04 +0800</pubDate>
        </item>
    </channel>
</rss>
