<?xml version="1.0" encoding="utf-8"?>
<!-- generator="FeedCreator 1.7.2" -->
<rss version="2.0">
    <channel>
        <title>Lowyat.NET: Latest topics by selamat_datang</title>
        <description></description>
        <link>http://forum.lowyat.net/</link>
        <lastBuildDate>Fri, 09 Oct 2026 05:08:28 +0800</lastBuildDate>
        <generator>FeedCreator 1.7.2</generator>
        <item>
            <title>HSR put on hold due to cost. Why not KTM instead?</title>
            <link>http://forum.lowyat.net/topic/5572120</link>
            <description>I noticed lowyat forum on average every year one HSR topic, the previous one 11 months ago.&lt;br /&gt;&lt;br /&gt;Actually, it’s good that HSR put on hold because of costs. Because otherwise, debt leave behind for decedents, which is very irresponsible.&lt;br /&gt;&lt;br /&gt;I just checked ChatGPT. If we want the KL-SG HSR to run at the same speed as Taiwan HSR (which is up to 300km/h), it would cost US&amp;#036;17-22 billion to build (in 2026 prices).&lt;br /&gt;&lt;br /&gt;Which is much more than the costs of hosting World Cup: at least US&amp;#036;1.1 billion (in 2026 prices).&lt;br /&gt;&lt;br /&gt;And much more than the net economic benefit (economic impact minus hosting costs) of hosting F1 at Malaysia: US&amp;#036;0.06-0.12 billion per race (in 2026 prices).&lt;br /&gt;&lt;br /&gt;Malaysia need to host F1 around 216 years then can recover cost of building KL-SG HSR. 108 years even if share cost with Singapore and also recovered via Singapore host F1 revenue. Which is not practical (public transport concession period usually about 30 years only).&lt;br /&gt;&lt;br /&gt;So, why not replace HSR technology with KTM ETS technology instead? Same alignment and local-express services as proposed. But KTM ETS instead of HSR. The construction costs can reduce to US&amp;#036;8.5–13.5 billion (in 2026 prices), which is a 35-50% cost reduction. Malaysia and Singapore just need to host F1 for 54 years then can recover already.&lt;br /&gt;&lt;br /&gt;Honestly though, introducing rail connection to new areas like Batu Pahat and Melacca will no doubt improve the public transport connectivity and promote those areas’ development. &lt;br /&gt;&lt;br /&gt;If it’s KL-SG KTM ETS instead, running at 140-160km/h, with an express train service running between KL and SG (just as originally proposed), still can travel between KL and SG within 155–170 minutes. Which is still 53-57% faster than bus (7am leave Jurong, Singapore, 1pm reach Kuala Lumpur. 6 hours or 360 minutes), and at least 13-44% faster than aeroplane (total 195-275 minutes from airport-to-airport, not including travel from Jurong to Changi at Singapore, and the travel from airport to city at Kuala Lumpur).&lt;br /&gt;&lt;br /&gt;I thought PH government like to tell everyone how they reduce the cost of RTS Link and LRT3? KL-SG HSR change to KL-SG KTM ETS also can have 35-50% cost reduction, and still be faster than bus by 53-57% and faster than aeroplane by 13-44%. Still quite a good option leh, and somemore the introduction of rail connectivity to new areas like Batu Pahat and Melacca can help to promote the development of those areas.&lt;br /&gt;&lt;br /&gt;So faster change the technology from HSR to KTM ETS, and revive the project as KL-SG KTM ETS already, can? Then don’t have to keep delaying anymore, and the project can finally bring to reality already.&lt;br /&gt;&lt;br /&gt;Hopefully my contribution via this article can help to revive the KL-SG HSR project as KL-SG KTM ETS project, and thereby help to enlighten the people living along the KL-SG KTM ETS alignment. &lt;br /&gt;&lt;br /&gt;You are welcome.</description>
            <author>selamat_datang</author>
            <category>Kopitiam</category>
            <pubDate>Sun, 26 Jul 2026 14:22:56 +0800</pubDate>
        </item>
    </channel>
</rss>
